Project #04
Apartment @ Lily Avenue, Colombo 06.
2nd-floor slab concrete.
2nd-floor slab concrete at Project 04
Related Posts
Soil Testing – Templer’s Edge
- 16/10/2024
- Templer's Edge
Project #06 (Templer’s Edge) Apartment @ No. 10, Templer’s Place, Mount Lavinia. Soil Testing Works (July 2024) We’re Conducting Thorough Soil Testing to Ensure Every Step Aligns with Nature and Meets the Highest Standards of Construction.
Balcony Brickwork – Windsta City
- 09/10/2024
- windsta city
Project #07 (Windsta City) Apartment @ No. 04, Windsor Avenue, Dehiwala. Balcony Brickwork (August 2024) Balcony Brickwork Is Taking Shape, Creating the Perfect Space for You to Relax and Enjoy Stunning Views!