PROJECT PROGRESS
The project was successfully completed – Project 05
You can dream, create, design, and build the most wonderful place in the world. But it requires people to make the dream a reality. Project #05 Mr. Samarajiva Home – @ Ratmalana. The project was successfully completed. (04th December 2021)
Finishing work at Project 05
We listen to your needs, Design it to your Specifications, and Build it to your Dreams. Project #05 Mr. Samarajiva Home – @ Ratmalana. Finishing work
Water tank slab at Project 05
Project #05 Mr. Samarajiva Home – @ Ratmalana. Water tank slab
1st Floor Electrical works at Project 05
Project #05 Mr. Samarajiva Home – @ Ratmalana. 1st Floor Electrical works are ongoing.
1st Floor plastering work at Project 05
Project #05 Mr. Samarajiva Home – @ Ratmalana. 1st Floor plastering work
1st Floor Masonry work at Project 05
Project #05 Mr. Samarajiva Home – @ Ratmalana. 1st Floor Masonry work.
Roof top concrete at Project 05
Project #05 Mr. Samarajiva Home – @ Ratmalana. Rooftop concrete.
Our newaly completed project at Ratmalana
Our newaly completed home project at Ratmalana. Happy client’s testimonials we will update soon on our Facebook. We are thanking the client for this opportunity, structural engineer, site engineer, project manager, staffs and labours.