Mezzanine to 6th floor column concrete at Project 04

There are no secrets to success. It is the result of preparation and hard work.
Project #04
Apartment @ Lily Avenue, Colombo 06.
Mezzanine to 6th-floor column concrete.

 

Related Posts

16

Oct
Updates

Soil Testing – Templer’s Edge

Project #06 (Templer’s Edge) Apartment @ No. 10, Templer’s Place, Mount Lavinia. Soil Testing Works (July 2024)   We’re Conducting Thorough Soil Testing to Ensure Every Step Aligns with Nature and Meets the Highest Standards of Construction.